CBM Solution

Challenges:

- Constrained production on gas production.

- Wells must be shifted in time in order to fit within these constraints

 

Flow Diagram – CBM Development Planning

 

A flow schematic is easily created in WellSpring to represent the field wells and facilities

 

 

Type Curve

 

The hundreds of proposed wells are based on typical production and represented by a “Type Curve”.

 

 

Unconstrained Run

 

Actual production potential is higher than the facilities can handle, so not all wells

can be brought on at the same time

 

 

Individual constraints can be added at each of the facility nodes

 

WellSpring then re-calculates the model, shifting individual wells

In time in order to meet the constraints

 

 

 

After the optimization, the field is producing within the facility constraints

 

 

 

This model can then be used to compare different facility sizes

 

We can create a second scenario with a different water handling capacity
The plot below shows the higher capacity subtracted from the base

 

 

Economics

 

With the respective capital and operating costs entered for these scenarios, an incremental comparison of the economics can be calculated to evaluate the alternatives.
In this example, the production is accelerated, but it doesn’t justify the increased capital for the larger facilities.