Enersight Releases WellSpring 2.0
Enersight is pleased to announce the release of WellSpring version 2.0.
Both Version 1.0 and Version 2.0 can be accessed from the Login menu on our website.
You can go back and forth between the old version and the new version. See it now
@ www.enersight.com
- WellSpring 2.0 has a completely new look and feel including color schemes and navigation.
- We've added direct integration of risk and sensitivity analysis
into the network economics. This lets
you lay out multiple risked development scenarios and quickly view the impact risk
has on your expected values and reserves.
-
Scenario comparison and reserve category graphs are now available
at the bottom of the PlanView tab. These graphs will plot results for all scenarios
or reserve categories side by side.
-
Project Folders are now available on the Projects tab. Users can create their own multi-level folder structure
and drag and drop their projects to simplify organization of projects.
-
Production Decline Sets. An asset can now have multiple decline parameter sets defined with each scenario specifying which one
is used in its calculations. You can view these different declines side by side on the Decline tab.
-
The "Fill Facility" auto-development rule has been expanded to support rig count.
WellSpring will now control the drilling program based on rig availability, drilling time and facility capacity so as to maximize production without overrunning the facility.
- Enhanced support for CBM reservoirs has been added allowing the
specification of varying gas composition and well deliverability as the reservoir pressure declines.
-
Decline Rates can now be entered in four different modes: Annual Nominal, Annual Effective, Monthly Nominal and Monthly Effective.
-
The reporting options have been increased to include quarterly reporting and cumulative reporting.
|
|
WellSpring 2.0 Quick Tips
|
WellSpring 2.0 contains a number of control key combinations to support fast access to commonly used screens.
Below is a summary of the quick keys currently supported.
To access the desired screen, select the appropriate letter while holding down the control key.
|
| Control Key & R |
|
To popup quick-reports for the current asset |
| Control Key & P |
|
To popup the General Data screen for the current project |
| Control Key & S |
|
To popup a Quick Graph and Summary Report |
| Control Key & K |
|
To popup the Risk Editor for the current asset |
Instant Hands-On Trial
Work with a live sample project that demonstrates WellSpring's capabilities.
Step-by-step instructions walk you through the example giving you a real hands-on feel for the power of WellSpring. Click here to give it a try!
See WellSpring @ the Calgary Petroleum Show in the Microsoft Technology Pavilion.
June 13-15 Booth #4023
Click here for a free pass to Global Petroleum Show.
|